top of page

Projects

Projects successfully completed by Herman van der Mast and BD Pool Services: 

  • Emperors Palace Casino & Hotel Complex (2000) - All the waterproofing, tiling and finishing plaster to the four water-features as well as the hotel pool. The largest feature is ±1500m² and the hotel pool ±900m².

  • Rand Merchant Bank (Johannesburg (1994 – 1999) - The design & supply contracts for both the structural and the reticulation/filtration aspects, comprising a ± 400m² bio-filtered feature, a ± 650m² feature with a 30m long rimflow sealed with Sikadur-Combiflex system and a 42m long by ± 2m high cascade feature

  • Private House,Johannesburg (2009) - This comprises a 1000m² ‘River’ and 100m² flush-deck pool with Summer Place Spa in it.

  • Sheraton Hotel, Pretoria (1998) - Waterproofing & finishing off of the swimming pool on the third-floor of the hotel

  • Hilton Hotel, Sandton (1999) - Designed & constructed the new ±350m² swimming pool

  • Trish Wilson @ Wilson and Associates Architects (1996) - Pool for “Izingwe Lodge” at Welgevonden Game Farm, Vaalwater.

  • The River Grand Lodge, Zambezi river (2012) - PMTP Developers, Lusaka, Zambia. Pool with 4,5m x 1,5m Window for the front wall.

  • House Clarke, Hilton Estate, Pietermaritzburg CC Architect (2014) - 15m rim-flow pool fully tiled

  • Silver Star – Soulstice Spa pools (2008)

  • SR Nicholas Limited, Zambia (1996) Mfuwe Lodge – Design and supply the reticulation & filtration system for the 100m² pool & rim-flow edge

  • The Regent Apartment Hotel (2011) and The Claridges (2011) - Design & installation of the hydraulic reticulation & filtration system for the water-features

  • ADIL Waterworld (Maputo) (2010) - Three ±120m² slide-pools, A ±980m² Lazy-River, ±900m² Main pool & a ±750m² central water-feature

  • Houghton Primary School (2008) - Pool refurbishment / upgrade for a 350m³ pool

  • Jeppe Girls High School (2009) - Making smaller (to 25m) of pool and refurbishment of the pool

  • Brescia House School (2010) - Refurbishment of the three pools – Tiling & pool-plaster

  • The Ridge School (2010 & 2011) - Refurbishment of three pools- Tiling & pool-plaster & fibreglass

  • Veritas College (2010 & 2013) - New filtration system & fibreglass lining for the pool

  • Deutsche Schule (Pta) (2011) - Refurbishment of the 25 x 20m pool -Tiling and paving

  • Assumption Convent (2013) - Fibreglass lining of the pool

  • Grayston Preparatory (2013) - Refurbishment of the pool – Tiling, New filtration system & paving

  • St Stithians College (2013) - Refurbishment of the Short-course (25 x 18m) pool

  • St Catherine’s (Florida) (2012) - Refurbishment of the pool – Tiling, pool-plaster, paving & filtration

  • St Mary’s School (2012 – 2014) - Refurbishment with a PVC lining & new piping of the Olympic pool

  • Kingsmead College (2014) - Tiling of Dive pool (25m x 20m pool).

  • King David Schools (2014) - Refurbishment of the short-course pools for the three Jhb based schools

  • St John’s College (2010 – 2014) - New filtration system for Longwalk pool (2011) and repair work to the tiling of the Polo pool and Longwalk pools (2014).

  • St Andrew’s School (2013 & 2014) - Dive pool – New diving board bases & installation of springboards. Main pool – Found & sealed structural leaks & made good tiling in pool.

  • St David’s Marist New filtration system manifold

  • Reddam House Bedfordview - New filtration system manifold

  • Franklin D Roosevelt Primary Re-plastering - Poolcrete pool plaster & tiling of the 25 x 13m pool

  • St Teresa’s, Rosebank (2014) - Tiling of the 25 x 14m pool

  • Jeppe High School for Boys (2016) - Tiling of 25 x 21m water polo pool @ a new 25 x 5m training pool

  • University of Johannesburg (2015) - New 100m² hydrotherapy pool for the Biokinetic Centre

  • Laerskool Jan Celliers (2016) - New 25 x 16.5m main pool

  • Reddam House Waterfall (2016) - New Olympic (50 x 25m) swimming pool

  • Reddford The Hills & Blue Hills - A new 30 x 25m multi-purpose swimming pool at each school

  • Marist Brothers Linmeyer - New 25 x 5.5m indoor pool, fully tiled

  • St David’s Marist, Sandton - New 33 x 25m Water- polo pool

  • St Andrew’s School for Girls, Senderwood - Rebuild & upgrade of a 25 x 20m indoor pool

We trust that the above gives you some idea of the versatility of the projects that we undertake. 

Click here to view our work 

bottom of page